Welcome to QiDa Road and Bridge Engineering~
中文    EN
项目案例

Project Name: 斗龙港大桥

English name: Bridge Doulonggang

Types of section: Bridge Cases

Project Introduction:

Bridge pile of Bridge Doulonggang is K38 + 464.3. It is now a category Ⅴchannel, navigable clearance (45 * 5) m, the highest navigable water level of 2.04 m. The intersection of the bridge and river is 90 degrees. The bridge is arranged for the left (5 * 30) composite box girder + (38.5 +60+ 38.5) to be highly prestressed concrete continuous box girder + (5 * 30) composite box girder; The right amplitude (5 * 30) composite box girder + (38.5 +60+ 38.5) is highly prestressed concrete continuous box girder + (5 * 30) composite box girder.





Next:River Jiaogang Bridge of National highway 328