Project Name: 串场河大桥
English name: Bridge Chuanchanghe
Types of section: Bridge Cases
Project Introduction:
Pile number of our bridge project Bridge Chuanchanghe in yancheng city section of Project national highway 204 is K42+601.0. It is now Ⅴ river waterway level, navigable clearance (45 * 5), highest navigable water level of 2.34 m. The intersection of the bridge and river is 50 degrees. The bridge is arranged for the left (8 *30+ 20) composite box girder + (48 +80+ 48) to be highly prestressed concrete continuous box girder + (6 * 30) composite box girder + (5 * 30) now water box girder; Box girder + (20 +5* 30) composite box girder + (5 * 30) of composite box girder + (5 * 30) is now pouring the box girder.